Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 63 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Roscommon County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Roscommon County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for Roscommon County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Roscommon County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for the following: 1. To demolish the existing attached outbuilding. 2. To refurbish derelict house to include alterations to elevations and construct new rear extension. 3. To install new treatment system and percolation area. 4. To construct a new entrance along the front boundary, to form new boundary fencing where required to define the garden space associated with the building unit, and to carry out all ancillary site development works at
For the construction of a single storey dwelling house with associated single storey storage shed, widened site entrance, waste water treatment system and ancillary site works, all at
Planning permission to construct new slatted sheep shed together with all associated site works at
To retain and complete partially constructed dwelling house with changes to dwelling house previously granted under PD/07/1529 and installation of septic tank system. The changes include the omission of the first floor, and all associated site works at
Permission for the construction of a machinery shed, a farm office, and associated site works at an existing farmyard at
Permission for the installation of a secondary treatment system and soil polishing filter to service an existing dwelling at
The brief summarizes the pattern across all 63 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560556The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief