Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 211 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension to existing storage shed.
To erect a single storey dwelling house with on site wastewater treatment system, bored well, entrance and all associated site works at
Alterations to front and side of existing Dwelling consisting of the following: Part demolition of existing living room to the side of existing Dwelling and the construction of a new single storey extension to the side of existing Dwelling, Removal of existing Patio doors to the front of existing Dwelling and for the replacement of same with a new window and for the construction of a new Domestic Garage as permitted under previous planning reference number 14/109 and all associated site works and services
The construction of a new 2 storey house, a garage, a bored well an entrance and a waste water treatment system along with all associated site works at
Construction of a cattle underpass, milking parlour complex and an animal house incorporating cubicles, straw bedded area, slatted tank, feed passage and associated works
Demolition of existing agricultural building
The brief summarizes the pattern across all 211 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560570The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief