Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 322 decisions within 5 km, 5 exact-site or onsite candidate records, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Agricultural entrance and all associated site works
Dwelling, garage, waste water treatment system to EPA standards, new entrance and associated site works
233 sqm single storey dwelling, 48 sqm single storey garage, vehicular entrance via existing agricultural entrance, bored well, effluent disposal system to current EPA standards, all associated ancillary site development works
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto existing entrance of laneway which leads to the public road, upgrading existing entrance onto public road and associate works
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
The brief summarizes the pattern across all 322 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560705The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief