Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 637 decisions within 5 km, 8 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a standalone bus shelter and all ancillary site development works
For the following works: change of use of existing laundry building to be used as a medical file store, to carry out alterations to existing building and undertake associated site works
For a 5,236 sq. m. three storey extension, with plant room at roof level, together with all necessary ancillary site works. The extension shall comprise of Emergency Department at Lower Ground Floor level, Endoscopy Unit and link corridor at Ground Floor Level, Inpatient Bed Ward at First Floor Level and Plant Room at Roof Level. It will also include the installation of Photovoltaic Panels on the roof of the existing hospital. The site works will include the provision of a carpark adjacent to the extension comprising 44 car spaces, 5 motorbike spaces and bicycle bay and a carpark comprising 150 parking spaces on the internal access road to the east of the extension
For Electrical Infrastructure Upgrade Works on the hospital campus which includes: 2no. new Substations. Substation Building 1 is located to the south west of the site and includes an associated compound and a containerised generator. Substation Building 2 is located to the north of the site and includes an associated compound and a containerised generator. In the location of Substation Building 2 works also include a new water tank, pumphouse, a new oil tank with associated fencing, and a gas compound containing 4no. gas tanks
- RED III - for the construction of a single storey geothermal plant building with an associated yard area including access stairs. The Geothermal plant building will house ground source heat pumps and will be connected by buried pipework to a series of geothermal boreholes located to the south of the existing hospital. This Geothermal Plant is set to serve the previously granted Cavan General Hospital extension planning application, Ref-2460276. The application includes all associated boundary treatments, landscaping, and site development works necessary to facilitate the installation and integration of the development within the hospital grounds
For the development of 7,588sqm accommodation, will comprise the following: 1) New 5 storey extension to accommodate an Emergency Department at Lower Ground Floor, an Endoscopy Unit at Ground Floor, Inpatient Ward Accommodation at First, Second and Third Floor, and Plant area at Fourth Floor 2) A link corridor to connect the proposed extension at ground floor level to the existing hospital at lower ground floor level. 3) External ASHP Compound and Plant 4) Waste Hold 5) Switch room constructed independently to the main build 6) 37 no. car parking spaces (including 10 no. accessible spaces and 4 no. EV charging spaces) 7) 7 no. motorbike spaces 8) All boundary treatments, vehicle and pedestrian accesses, landscaping, and associated site development works
The brief summarizes the pattern across all 637 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560714The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief