Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 445 decisions within 5 km, 3 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) a new sports pavilion building with rooftop viewing terrace, (2) new all weather pitch with associated fencing and floodlighting, (3) realignment of existing perimeter path and (4) paths and access road, bicycle shelter together with all associated services and site development works. The works are in the curtilage of a Protected Structure
New floodlighting to the existing main pitch and training pitch. The works are in the curtilage of a Protected Structure
A new floodlighting to the training pitch (the works are in the curtilage of a Protected Structure)
Works to the former back kitchen area for use as a student lounge to include alterations to existing building opes, conversion of existing window to a door, new internal finishes, installation of new building services including supply and extract affecting the external elevations and installation of mechanical plant in the existing enclosed yard, the proposed works are in the curtilage of a Protected Structure (RPS 134)
The subdivision of existing retail unit N29 at ground floor level for use as optometrist/retail and planning permission for the subdivision and change of use of existing first floor fallow area incorporating 2 No. offices, staff rooms, laboratory and connecting hallway space for use by optometrist business
The amalgamation of 4 No. existing retail units (No's,. 1,2 3 & 4) at ground floor level, including a first floor unit for ancillary storage/retail, for use by a sporting goods retailer
The brief summarizes the pattern across all 445 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560813The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief