Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 814 decisions within 5 km, 2 exact-site or onsite candidate records, and 66 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
66 structured nearby appeal records.
66 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. installation of 8 no. electric vehicle charging bays with 8 no. Tesla illuminated charging units and associated signage, II. installation of proposed Tesla supercharger power cabinet equipment, III. installation of proposed modular substation, IV. erection of associated EV signage, V. all associated site development works including surfacing, lighting & line marking
Section 254 - Roadside Directional Signs - Location 4 Map WH2
Section 254 - Roadside Directional Signs - Location 3 Map WH1.
Single storey dwelling with well, shared vehicular entrance and for a new wastewater treatment system to current EPA standards and all ancillary site works
Reclamation of land through the filling of material comprising clay, silt, sand, gravel and stone on a site having an area of 4.88 ha for the purpose of improvement of land, together with site access and associated site works. This proposed development relates to an activity which requires a waste licence
Section 254 - Roadside Directional Signs - Location 5 Map WH2
The brief summarizes the pattern across all 814 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560848The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief