Applications tied to the site
Partial coverage31 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
31 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 879 decisions within 5 km, 31 exact-site or onsite candidate records, and 41 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
31 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
31 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
41 structured nearby appeal records.
41 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Intensify the usage of the creche, located at the Maltings, Harpurs Lane Portlaoise previous planning grant reference 24/60056. The existing planning accommodates 22 children, and the new application is designed to accommodate 58 children. The car parking for staff has been increased. The play area has also been revised.
Modify the granted planning 25/60636 for the construction of a new two-storey property manager office building development on lands at Harpur’s Lane, Portlaoise, Co. Laois (part of former Minch Norton Maltings). The proposed development seeks to increase the previously granted office building area from 41.8m2 to 74.90m2 to serve as the administrative headquarters for The Maltings and Granary Management Company by adding an extra storey. By increasing the size of the building and adding a first floor we have added an additional maintenance area on the ground floor along with an additional toilet from the previous granted planning 25/60636.
Carry out development which will consist of a new single story property manager office building 41.8m2 that includes a meeting room, toilet, kitchen and office along with associated car parking
Extension of duration for file ref. 20/15
Change use of two storey joinery workshop to three, one bedroom apartments and one studio apartment. Restoration and alterations to existing concrete structure, removal of existing round roof and replacement with round roof (ridge height increase to match Boston Medical Centre) with attic bedroom and storage accommodation, single storey extensions to east and west gables with private amenity balcony's, private garden area to east and 3 car spaces, single storey porch entrance extension of existing car park on south elevation and ancillary site works
Modify existing granted planning permission under Reg. Ref. 20/52 (nursing home) as follows: • A new low wall and metal railing along northern boundary. • Additional private open space provision along with revised landscaping. • New management storage compound to be used by the management company for the storage of equipment and materials. A 'bring-to' area to the southern end of the site will be used by the residents of the scheme. • Reduction in floor to ceiling heights (from 3.6m as permitted to 3.3 m at first floor level and 6.84 m to 6.6 m at second floor level.) and resulting reduction in height of eaves of the roof from 10.74 m to 9.4 m and reduction in height of parapet from 11.64 m to 10.3 m. • Changes to window heights and locations • The overall site area will increase from 1.007 hectares to 1.059 hectares. • The car park at the Southern end of the nursing home has been altered.
The brief summarizes the pattern across all 879 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560884The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief