Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 124 decisions within 5 km, 5 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of the following works, 1. Extension to existing slatted cubicle shed to contain cubicles and slatted tank; 2. Construct New Slatted Shed containing slatted tank, cubicles and calf pens; 3. New calf Shed; 4. 2 No. New Silage bases; together with all associated site works
Henry & Mary Mellett are seeking to retain,on a revised site, the alterations and extensions to their dwelling house initially granted under planning permission 93/1309 and to retain a garage on the same site
Construction of a slatted house, silage slab and all ancillary works
The development will consist of the construction of a dwelling house, garage, septic tank and percolation area all as per drawing documentation submitted together with all ancillary site works and services.
The development will consist of the construction of a dwelling house, garage, septic tank and percolation area all as per drawing documentation submitted together with all ancillary site works and services.
A) Planning permission to retain existing dwelling house and septic tank system on revised site boundaries to that granted permission under previous planning reference P79/817, b) Retain as constructed domestic storage sheds within the revised boundary, c) retain site entrances as constructed and, d) construct upgrade works to the on-site septic tank system.
The brief summarizes the pattern across all 124 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560942The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief