Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 176 decisions within 5 km, 4 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Change of use, refurbishment, conversion and adaptation of a Vernacular Farm Building (former Coach House) to a four bedroom two-storey dwelling house with a single storey extension at ground floor level, new domestic septic tank wastewater treatment system and all associated site works
The erection of 50 dwellings on a site area of 2.9 Hectares to be accessed from a new entrance junction at the R688 (Clonmel Road) and more specifically described as: 8 no. two storey three bedroom semi-detached dwellings, 20 no. two storey four bedroom semi detached dwellings, 22 no. two storey four bedroom detached dwellings, 120 no. car parking spaces (100 no. spaces for dwellings, 20 no. visitor spaces) and private, communal and public landscaped amenity spaces, internal estate road network, pedestrian pavements, inter-site boundary walls and fences, new perimeter site boundary walls and fences, undergrounding of existing overhead electricity supply cables to the development site, public lighting, public drainage and water services connections, replacement of the existing defective storm water attenuation tank and pipework serving the Knockeevan estate, removal of 3 no. existing house foundation floor slabs and associated site development works
(1) construction of a building containing convenience store and 10 retail units on ground floor with office space on the 1st floor above the convenience store; (2) construction of a building containing bar on the ground floor with restaurant on the first floor; (3) construction of 77 houses, one of which will contain a creche; (4) entrance and associated site works
(a) construction of new single storey building comprising changing rooms and multi-purpose community rooms (b) advanced waste water treatment system and percolation area (c) all associated site boundary and site development works including an external viewing area. The development is situated adjacent to S627, a Protected Structure in the South Tipperary Development Plan 2009-2015
Proposed new single storey entrance lobby extension to existing school building, proposed new single storey extension to existing multi-purpose hall building, alterations to portion of existing boundary fence and all associated site works
Demolition of existing sun room, alterations to existing dwelling including new windows, façade alterations, covered patio area, amended access and boundary walls with all associated site works
The brief summarizes the pattern across all 176 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560986The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief