Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 344 decisions within 5 km, 1 exact-site or onsite candidate record, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
The development consists of (a) permission to construct a dwelling house incorporating a garage and detached home office/gym and (b) permission to connect to all mains services and for all associated site works to facilitate this development
CHANGE OF USE FROM EXISTING HOLIDAY RESIDENTIAL USE TO PRIVATE RESIDENTIAL USEAND TO FENCE OFF THE REAR PRIVATE OPEN SPACEAND RETAINTION PERMISSION TO RETAIN ELEVATION CHANGES TO THE HOUSEALL WITHIN REVISED SITE BOUNDARIES
(A) DEMOLISH AN EXISTING DOMESTIC GARAGE ON THE SITE (B) CONSTRUCT TWO SELF CATERING UNITS TO THE REAR OF THEIR SITE FOR SHORT TERM RENTAL PURPOSES (C) CONNECT TO EXISTING SERVICES ON THE SITE AND (D) ALL OTHER ASSOCIATED SITE WORKS RELATING TO THE DEVELOPMENT
(A) DEMOLISH EXISTING DWELLING HOUSE AND (B) TO CONSTRUCT A NEW DWELLING HOUSE TO REPLACE SAME INCLUDING ALL NECESSARY ANCILLARY WORKS
CONSTRUCT A NEW DOMESTIC GARAGE ADJACENT TO DWELLING HOUSE. THE ABOVE TO BE CARRIED OUT WITH ALL ASSOCIATED ANCILLARY SITE WORKS.
CONSTRUCT A GROUND FLOOR EXTENSION FOR DOMESTIC USE ONLY TO THE SOUTH EASTERN CORNER OF EXISTING DWELLING HOUSE/GUEST HOUSE INCLUDING ALL NECESSARY ANCILLARY WORKS TO FACILITATE THE CONSTRUCTION OF THE EXTENSION
The brief summarizes the pattern across all 344 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561001The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief