Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 193 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(i) existing extension to an existing dwelling, (ii) existing garage, as well as PLANNING PERMISSION for (iii) the construction of a new extension to the existing dwelling, (iv) new waste water treatment system, (v) new entrance and all associated site development works
A new Wastewater Treatment Plant with sand polishing filterer & percolation area and all associated site works to replace existing septic tank system on site
Construct extension to rear/East of existing farmhouse dwelling, demolition of existing sunroom to South and replacement with feature bay window to South, new window to southern elevation at first floor, extension of the dwelling to the West/Northwest and reuse of existing adjoining agricultural out-house as habitable accommodation and this to be integrated into the main dwelling to function as one dwelling, alterations, refurbishment and up grading of existing dwelling, repair and reroofing of existing damaged outhouse, to the South East to be used as garage, upgrading of the existing site effluent system as appropriate, modification of external walls and fencing as appropriate and all associated works
Extension of an existing cattle shed and the construction of an underground slatted slurry storage tank in the existing cattle shed and proposed extension, together with any associated concrete yards and site works
Part demolition of existing cottage, and adjoining structures and construction of new extension, including raising the roof of the original cottage, construction of new detached garage, construction of new vehicular entrance to the east to replace existing, installation of new wastewater treatment system to replace existing and all associated site works
Alterations to previously granted planning permission (PD. ref: 2360327) to include a reduction in footprint by 5m2 and the addition of a 5m2 plantroom to the north elevation and to change the external wall finish in part from a render finish to cladding together with all associated site works
The brief summarizes the pattern across all 193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561103The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief