Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 41 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(a) Retention permission to retain alterations made to the dwelling house including an additional window at the rear and revised external wall finishes to the front gable and rear wall, (b) Retention permission to retain the dwelling house, all associated site services and ancillary site works as located within revised site boundaries and, (c) Full planning permission to disconnect from the existing septic tank and install a new EN12566-3 wastewater treatment unit and associated polishing filter within the confines of the site and all other associated site works
CONSTRUCT A DOMESTIC GARAGE ALONG WITH A CAR PORT TO THE REAR OF MY EXISTING DWELLING AND COMPLETE ALL ANCILLARY SITE WORKS
UPGRADE OF THE TELECOMMUNICATIONS NETWORK. THESE WORKS WILL INVOLVE THE REPLACEMENT OF AN EXISTING 8M WOODEN POLE FOR A 12 METRE HIGH FREE STANDING COMMUNICATIONS STRUCTURE WITH ITS ASSOCIATED ANTENNAE, COMMUNICATION DISH, GROUND EQUIPMENT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT WILL FORM PART OF EIRCOM LTD EXISTING TELECOMMUNICATIONS AND BROADBAND NETWORK.
INSTALL A 12M MONOPOLE TYPE TELECOMMUNICATIONS SUPPORT STRUCTURE, CARRYING ANTENNA AND DISHES TOGETHER WITH ASSOCIATED GROUND EQUIPMENT CABINETS, FENCING AND ASSOCIATED SITE WORKS. THE INSTALLATION WILL FORM PART OF THREE IRELAND LIMITED MOBILE TELECOMMUNICATIONS NETWORK. A NATURA IMPACT STATEMENT (NIS) IS SUBMITTED WITH APPLICATION
ERECT A 15 METER HIGH TELECOMMUNICATIONS MONOPOLE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT WITHIN A WOODEN FENCED COMPOUND AND ALL ASSOCIATED SITE WORKS USING AN EXISTING ACCESS TRACK. ON COMPLETION OF THE WORKS THE EXISTING INSTALLATIONS COMPRISINIG TWO 13 METER HIGH WOODEN POLES, BOTH SUPPORTING TELECOMMUNICATIONS EQUIPMENT, WILL BE REMOVED
Permission to Construct a Dwellinghouse served by a Septic Tank and Polishing Filter
The brief summarizes the pattern across all 41 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561125The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief