Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 1,802 decisions within 5 km, 3 exact-site or onsite candidate records, and 210 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
210 structured nearby appeal records.
210 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of a single storey extension to rear, addition of dormer roof extension at first floor, extensive alterations to the existing facades and deep refurbishment of the property with associated site works. Significant further information/revised plans submitted on this application
(A) A rear and side, ground-floor extension (97sq.m.) and front porch (3.5sq.m.) (B) A pre-existing roofed, partially open, detached storage area (95sq.m.) (C) A detached, side and rear, open, roofed BBQ area (56q.m). (D) A detached rear shed (16sq.m.) (E) A detached, covered, circular fire-wood store (13sq.m.) (F) A pair of wooden gates(2mm high and 4mm wide) as vehicular entrance to front. Significant further information/revised plans submitted on this application
10 years for the construction of a 37.74 sq.m. ESB Sub-Station and Switch Room with access to the nearby R147 including associated site works to facilitate improvements to the water supply network
The proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as temporary substation to help power the campus during construction stage. The site area is circa 0.04 Ha. The building has since been decommissioned and the applicant is applying for retention permission to retain the building for storage of landscaping materials and maintenance equipment. The building is two tiered with different heights. The building measures approximately 12.5 metres in length and has a height of 2.9 metres on the lower side of the tier and a height of 4.27 metres on the higher tier. The building has a width of 5.3 metres at both ends. The building being retained has an area of 69.5sq.m.
Part off-license use in the existing retail unit
The proposed development involves the demolition of existing structures on the construction of part 4 storey and part 6 storey mixed use retail + residential development. The development will provide 3 no. retail units and 4 no. on-street car parking at the ground floor. The upper floors will contain 45 no. Apartments comprising of 5 no. one-bed, 32 no. two-bed and eight no. three-bed units, 54 no. car parking spaces located undercroft at ground level are provided use. A landscaped podium is provided at first-floor level providing the required amenity open space. A bike store, bin store and additional storage areas for retail are provided in the ground floor level all with associated landscaping and site works
The brief summarizes the pattern across all 1,802 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561127The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief