Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 361 decisions within 5 km, 1 exact-site or onsite candidate record, and 36 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
36 structured nearby appeal records.
36 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new dwelling house, detached garage, entrance, driveway, packaged wastewater unit and percolation area and all ancillary site works
Construction of a cubicle house, straw bedded shed, slatted tanks, manure pit and concrete aprons
Existing mobile home for use during construction period and Planning Permission to (a) construct a new replacement single storey dwelling with integrated domestic garage, install new packaged wastewater unit with percolation area, entrance and driveway with all associated site works, (b) Change of use of existing derelict cottage to a store for the keeping of equipment ancillary to a photovoltaic (PV) panel system
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works
6 no. new flood lights, provision of a new walking track around the pitch and to widen the existing site entrance an all ancillary site works. Retention Permission is also sought for 6 no. flood lights
Erection of a standalone prefabricated building comprising a classroom to the rear of the existing school
The brief summarizes the pattern across all 361 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561160The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief