Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 345 decisions within 5 km, 1 exact-site or onsite candidate record, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
Permission to construct a 2 storey extension to my 2 storey dwelling house including all necessary modifications to the existing dwelling to facilitate both the construction of the extension and internal remodelling.
(a) RETAIN EXISTING PORCH, ELEVATIONAL CHANGES, REAR EXTENSION AND ATTIC CONVERSION AS CONSTRUCTED, (B) RETAIN REAR OUTBUILDING AS CONSTRUCTED, (C) RETAIN NEW VEHICULAR ENTRANCE AS CONSTRUCTED AND PERMISSION TO BLOCK UP ORIGINAL VEHICLE ENTRANCE (D) FULL PLANNING PERMISSION TO DEMOLISH EXISTING GARAGE AND TO CONSTRUCT A NEW GARAGE, (E) FULL PLANNING PERMISSION TO CONSTRUCT A NEW EXTENSION TO LINK THE EXISTING DWELLING HOUSE TO THE OUTBUILDING AND ALL ASSOCIATED SITE SERVICES, (F) FULL PLANNING PERMISSION FOR CHANGE OF USE OF OUTBUILDINGS TO RESIDENTIAL USE
CONVERT ONE DWELLING (AS PER PLANNING NO 14/647) BACK INTO TWO SEPARATE DWELLING WITHIN THEIR OWN SEPARATE SITES (AS PER ORIGINAL PLANNING NO 04/196) AND ALL ASSOCIATED SITE WORK TO FACILITATE THIS DEVELOPMENT
The development consists of (a) retention planning permission to retain an extension on the western side of the building, a larger covered area in the enclosed yard on the eastern side of the building and a canopy at the front of the building, (b) retention planning permission to retain elevational changes made to the building, (c) permission to construct an extension on the eastern side of the building, (d) permission to construct an extension and a canopy over the existing roller door on the western side of the building and (e) permission for all elevational changes to the existing building to facilitate the development and all associated site works.
John Michael and Olive O’ Sullivan for Full Planning Permission to construct a new dwelling house with connection to wastewater treatment system and all associated site services
CONSTRUCT A NEW DWELLING HOUSE WITH CONNECTION TO WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE SERVICES
The brief summarizes the pattern across all 345 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561162The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief