Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 119 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning Permission to a) construct a new dwelling, b) install a mechanical treatment unit with gravity soil polishing filter, c) construct a vehicular site entrance and d) construct all associated site works
(A) DEMOLISH EXISTING DERELICT HOUSE (B) PERMISSION TO CONSTRUCT A NEW DWELLING HOUSE, TREATMENT UNIT AND GRAVITY POLISHING FILTER AND ALL SITE DEVELOPMENT WORKS
EXTEND EXISTING SILO BASE AND SILO APRON BY 2.5M IN WIDTH AND CONSTRUCT A SILO WALL 2.4M HIGH ON THE LOWER SIDE ALL NECESSARY SILO CHANNELS TO BE CONSTRUCTED, SILO EFFLUENT TO CHANNELED TO EXISTING EFFLUENT TANK
CONSTRUCT AN EXTENSION TO EXISTING SILAGE BASE, NEW WALLS ON THREE SIDES COMPLETE WITH SAFETY BARRIERS, EFFLUENT CHANNELS AND EXTENSION TO WORKING APRON AND ALL ANCILLARY SITE WORKS
CONSTRUCT A NEW ENTRANCE INCORPARATING GATES, POSTS, RAILING WIRE AT BOTH SIDES OF THE PUBLIC ROAD TO ALLOW COWS TO CROSS THE ROAD IN A SAFE MANNER AND ALL ANCILLARY SITE WORKS
CONSTRUCT A FARM SLATTED UNIT BUILDING
The brief summarizes the pattern across all 119 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561173The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief