Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
29% of nearby decided applications were refused. The site check found 92 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
To (1) construct new dwelling house (2) installation of a wastewater treatment system and associated polishing filter bed, as well as ancillary site works and site services
To: (1) construct new dwelling house, (2) installation of a wastewater treatment system and associated polishing filter bed, as well as all ancillary site works and site services. Gross floor space of proposed works: 173.20 sqm
To construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floor space of proposed works: 175.40 sqm
For the construction of a single story extension at St Thomas's Church, 6.6 sqm in area at the South West corner of the church where the tower abuts the nave to cater for a compostable toilet and sanitary facilities. This extension will have a mono-pitch roof of natural slates and rendered walls. This is a protected structure. Gross floor space of proposed works: 6.6 sqm. Gross floor space of work to be retained: 130 sqm
To (1) construct a new dwelling house, a new effluent treatment system and all associated site works.Gross floor space of proposed works 177.90sqm.
And the complete alterations to dwelling house and provide an upgraded proprietary effluent treatment unit for the dwelling house along with all associated services
The brief summarizes the pattern across all 92 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561179The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief