Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 136 decisions within 5 km, 7 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Preschool and Breakfast Club use to the already granted Afterschool Club use in the larger separate prefabricated building located on the school grounds
2no. prefabricated buildings, following the recent completion of the school extension project. The larger one shall be for an Afterschool Club and the smaller one shall be for a Sensory Room for pupils with ASD
A side and rear extension comprising a replacement mainstream classroom, replacement resource room, user assisted toilet, lobby with removal of prefab classroom and prefab resource room including all ancillary and associated services and Permission for Retention for a temporary period of the prefab classroom and prefab resource room relocated to the Southern boundary of the playground for the duration of the proposed work
A side and rear extension comprising a replacement mainstream classroom, replacement resource room, user assisted toilet, link corridor, a new foul water treatment system, new internal staff car park, revised road entrance drop-off and bus bay and Permission for Retention for a temporary period of the prefab classroom and prefab resource room relocated to the southern boundary of the playground for the duration of the proposed work including all ancillary and associated services
An easy feed slatted cubicle house incorporating cubicles feed barriers, canopy, scraped passages, feed passages, slatted underground tanks and a shed to store machinery and straw and all other ancillary site works
One and a half storey dwellinghouse and separate garage, new entrance, wastewater treatment system and associated site works
The brief summarizes the pattern across all 136 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561244The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief