Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 422 decisions within 5 km, 5 exact-site or onsite candidate records, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development on c.5.47 ha site. This application forms Phase 2 of a 3 phase residential development on an overall landholding with an area of c.9.29 ha. The proposed Phase 2 development will consist of: 95 no. 2 storey houses to be provided as follows: • 7 no. 2 bed two storey mid & end-terrace houses (House Type T1c); • 32 no. 3 bed two storey mid-terrace houses (House Type R2c-Mid); • 15 no. 3 bed two storey end-terrace houses (House Type 6c); • 21 no. 3 bed two storey end-terrace houses (House Type R2c-End); • 4 no. 3 bed two storey semi-detached houses (House Type House Type N1); • 16 no. 4 bed two storey semi-detached houses (House Type O1). o A total of 151 no. surface car parking spaces are proposed to serve the houses. A total of 78 no. secure long-stay cycle parking spaces are proposed for residents; o The development includes cycle paths, footpaths, and internal roads, with proposed infrastructure and access points provided up to the application site boundary to facilitate potential future connections to adjoining lands; o Provision of new vehicular accesses off the R148 and the R158, a new footpath along the R148, and the provision of a link street from the R158 to the boundary of the adjoining Bawnogues Park residential development to the south east of the subject site; o The development includes foul and surface water drainage, including attenuation system, bin stores, public and communal open space, public lighting, landscaping and boundary treatment works, services and all associated and ancillary site works and development
Raising pillars, erecting railings, and gates to front and part side boundaries of house
The proposed Phase 1 development will consist of: o 93 no. residential units, consisting of 55 no. houses, 16 no. duplex apartments, and 22 no. apartments, to be provided as follows: 21 no. 3 bed two storey mid-terrace houses House Type R2c-Mid); 15 no. 3 bed two storey end-terrace houses (House Type R2c-End); 11 no. 3 bed two storey end-terrace houses (House Type 6c); 6 no. 3 bed two storey semi-detached houses (House Type N1); 2 no. 4 bed two storey semi-detached houses (House Type O1); 16 no. 1 bed duplex apartments (Types 4H1a & 4H1b) provided within 4 no. two storey duplex buildings; 22 no. apartments (10 no. 1 bed and 12 no. 2 bed) located within a part 4 no. storey / part 5 no. storey apartment block, all provided with private balconies, terraces, or gardens. A childcare facility (with a Gross Floor Area of 393 sq.m), with associated play area, at ground floor level of the apartment block; A total of 172 no. surface car parking spaces are proposed to serve the residential units, visitor parking and the childcare facility. A total of 90 no. secure long-stay cycle parking spaces are proposed for residents and the childcare facility, together with 27 no. short-stay/visitor cycle parking spaces. The development includes cycle paths, footpaths, and internal roads, with proposed infrastructure and access points provided up to the application site boundary to facilitate potential future connections to adjoining lands; Provision of new vehicular accesses off the R148 and the R158, a new footpath along the R148, and the provision of a link street from the R158 to the boundary of the adjoining Bawnogue Park residential development to the south east of the subject site; The development includes foul and surface water drainage, including attenuation system, bin stores, public and communal open space, public lighting, landscaping and boundary treatment works, services and all associated and ancillary site works and development. Revised by Significant Further Information which consists of: Amendments to Phase 1 house, duplex apartment and apartment types, including the introduction of a new three-storey end-of-terrace house (House Type X) and the replacement of Duplex Type 4H1 with revised Types 4H1c and 4H1d. Amendments to the apartment building include a further setback at fourth-floor level, internal reconfiguration of floorplans including the omission of the 2-bed 3-person apartment type, enhanced façade articulation, and revisions to material treatment
STRATEGIC HOUSING DEVELOPMENT (ABP DECISION): Demolition of detached, vacant cottage(gfa 69sqm) and the construction of 298 residential units (181 no. dwellings and 117 no. apartments), childcare facility and foul pumping station along with associated ancillary works and site works.
For demolitions and alterations to an existing dwelling to include: (1) new first floor level to the existing dwelling; (2) a new single storey extension to the rear; (3) new garage, and (4) all associated site works
For the construction of a foul pumping station and all associated site and infrastructural works including: An underground wastewater pump station (a wet well 7.2m below ground); A welfare building of 6.25 sq.m and 3m in height; 472m of 125mm OD rising main along the R148, 250m of gravity sewer along the R148, Gravity sewer connection to the south of the site, Watermain connection, An underground emergency storage tank, with capacity of approximately 132m3, 7.2m below ground, Above ground lifting gantry, Valve and flowmeter chambers, A chemical dosing facility for odour control, Passive carbon unit, Kiosks, Above ground surge vessel (<13 m3), Perimeter Landscaping, fencing and re use of the existing vehicular access off the R148. All associated site development works. The proposed development includes all necessary ancillary pipework and manholes, diversion of existing utilities; new power supply and water connection for the pump station, ducting, mechanical and electrical services, plant, instrumentation, automation, controls and equipment. It also includes all associated site development works, hard standing areas and access and site drainage. The proposed development includes works on lands owned by Kildare County Council to facilitate access and drainage infrastructure.
The brief summarizes the pattern across all 422 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561347The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief