Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,846 decisions within 5 km, 5 exact-site or onsite candidate records, and 261 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
261 structured nearby appeal records.
261 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The erection of 2 no. new 12.2m high lighting columns, 2 no. new 21.34 high lighting columns, 2 no. new 21.30 high lighting columns, 4 no. new 15.24m high lighting columns, 21 no. new max 6.0m high lighting columns, 3 no. new 15.0m high ball stops, 2 no. new 3.0m high ball stop and 3.0m high cranked fencing around the existing GAA fields
To demolish existing single storey rear extension, construct a new two storey rear extension, single storey rear extension to the southerly side of this proposed two storey rear extension and a single storey side and rear extension on the northerly side of this proposed two storey rear extension, new front entrance porch, alteration to first floor landing window on the side elevation and inclusion of a new high level first floor window on the side elevation, some internal alterations on ground and first floor levels
Extension of Duration: Erection of 2 No. new 12m high lighting columns to the west of the existing hurling wall; Erection of 24 No. new (up to) 5m high lighting columns around the perimeter of the site; Erection of 3 No. new 21m high lighting columns to the south of the existing main pitches; Erection of 4 No. new 15.24m high lighting columns around the future junior pitch to the south of the site. All associated site development works as per Planning Ref: 19/733
Attic conversion to habitable accommodation (Bedroom & En-Suite) including roof windows using existing vehicular entrance and all associated site works
Erection of 2 No. new 12m high lighting columns to the west of the existing hurling wall; Erection of 24 No. new (up to) 5m high lighting columns around the perimeter of the site; Erection of 3 No. new 21m high lighting columns to the south of the existing main pitches; Erection of 4 No. new 15.24m high lighting columns around the future junior pitch to the south of the site. All associated site development works
A) the demolition and reconstruction of the existing boundary wall; b) the construction of a single storey extension of the ground floor to the front, side and rear of the dwelling consisting of a new porch, playroom, utility room, kitchen, dining and living area and; c) a new pedestrian entrance on the boundary wall to allow for bin access all together with all associated site works
The brief summarizes the pattern across all 1,846 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561393The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief