Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,044 decisions within 5 km, 4 exact-site or onsite candidate records, and 176 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
176 structured nearby appeal records.
176 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Duration for Planning Ref. 20/110: demolition of a single storey annex to side of existing house, construction of a new two storey extension to the side of the house, construction of a detached garage, new block boundary walls together with all associated site works
Demolition of a single storey annex to side of existing house, construction of a new two storey extension to the side of the house, construction of a detached garage, new block boundary walls together with all associated site works
Demolition of existing single storey annex to side of existing dwelling and construction of 2no. two storey extensions to the gable and rear of existing dwelling and 2no. single storey extensions to the front and rear of existing dwelling. Retention permission to retain modifications to site entrance and all associated site works
The construction of a dwelling house, new entrance onto Fuchsia Avenue, connection to public water and sewer along with ancillary site works
Bay glazed screen to front and replacement of flat roof with pitched roof to porch and front of former garage
Modifications to the existing dwelling and extension to the front of the property and change of use of garage into a room with all associated site works
The brief summarizes the pattern across all 2,044 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 257014The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief