Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 518 decisions within 5 km, 5 exact-site or onsite candidate records, and 43 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
43 structured nearby appeal records.
43 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Duration for Planning Ref. 21/413: the construction of an entrance, dwelling house, domestic waste water treatment system and polishing filter together with all associated site works
The construction of an entrance, dwelling house, domestic waste water treatment system and polishing filter together with all associated site works
The construction of a dwelling house, waste water treatment system and percolation area, entrance and all ancillary site works
Construction of an extension to link dwelling to garage, dormer to garage roof, window to rear gable and change of use of garage to living accommodation in order to provide an independent living unit along with all associated site works
Construction of a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
The construction of a dwelling house, waste water treatment system and percolation area, entrance and all ancillary site works
The brief summarizes the pattern across all 518 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 257032The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief