Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 240 decisions within 5 km, 2 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, DOMESTIC OUTBUILDING, A BORED WELL, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE
ERECTION OF 2 NO. 28M WIDE X 13M HIGH BALL STOPS AND 2 NO. SETS OF GOAL POSTS TO THE EXISTING PLAYING PITCH TO THE REAR OF THE SCHOOL ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
I. A STEEL-FRAMED METAL SHED AS CONSTRUCTED, AND PERMISSION FOR THE CONSTRUCTION OF NEW INTERIOR PARTITION WALLS AND TOILETS THERIN. II. PERMISSION FOR THE CONSTRUCTION OF A NEW STEEL-FRAMED COVERED WALKWAY LINK. III. ALL ASSOCIATED SITE WORKS
A TWO-STOREY EXTENSION TO THE REAR OF THE EXISTING SCHOOL BUILDING, CONSISTING OF A SPECIAL NEEDS UNIT, SIX ADDITIONAL CLASSROOMS AND ANCILLARY ACCOMODATIONS. THE PROPOSED DEVELOPMENT WILL ALSO CONSIST OF A NEW HARD PLAY AREA OVER AN EXISTING BASKETBALL COURT, TWO BALLCOURTS IMMEDIATELY TO THE NORTH OF THE MAIN SCHOOL CARPARK, ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
PROVISION OF TWO NEW CAR PARKING AREAS AT THE SCHOOL COMPRISING 70 NO. NEW CAR PARKING SPACES IN TOTAL; 38 NO. SPACES WILL BE PROVIDED TO THE WEST (SIDE) OF THE EXISTING SCHOOL ALONG WITH A NEW ROAD ENTRANCE AND 32 NO. SPACES AND SET DOWN AREAS WILL BE PROVIDED TO THE NORTH (REAR) OF THE EXISTING SCHOOL WITHIN THE SCHOOL BOUNDARIES. A NEW BUS SET DOWN AREA TO THE FRONT (SOUTH) OF THE EXISTING SCHOOL WILL BE PROVIDED ALONG WITH REALIGNMENT WORKS TO THE EXISTING ROAD AND REALIGNMENT OF THE EXISTING SCHOOL ENTRANCE AND INTERNAL ACCESS ROAD TO THE PROPOSED CARPARK AND SET DOWN AREAS. THE PROPOSED DEVELOPMENT WILL ALSO CONSIST OF A SINGLE-STOREY LINK CORRIDOR EXTENSION TO THE SIDE OF THE EXISTING SCHOOL; TOTAL AREA OF 30M2 ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
THE CONSTRUCTION OF 1 NO. TEMPORARY ACCOMMODATION PREFABRICATED CLASSROOM BUILDING COMPRISING OF 3 NO. CLASSROOMS TO THE CENTRAL COURTYARD OF EXISTING SCHOOL, CONNECTIONS TO EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 240 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2598The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief