Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 711 decisions within 5 km, 5 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct an extension and alterations to existing dwelling house together with associated site services
RETAIN TWO STOREY EXTENSION AND ALTERATION TO REAR AND SIDE OF EXISTING DWELLING HOUSE TOGETHER WITH ASSOCIATED SITE SERVICES
ALTERATIONS AND EXTENSIONS TO DWELLING HOUSE
CONSTRUCT SUN ROOM EXTENSION TO EXISTING DWELLING HOUSE
Construct a granny flat attached to existing dwelling house, construct a ground floor kitchen extension to existing dwelling house, together with associated site works and services
CHANGE OF USE TO A DWELLING OF OUTBUILDINGS TO REAR, INCLUDING NEW GARDEN ROOM EXTENSION AND REINSTATEMENT OF FORMER GLASSHOUSE; LIME REPOINTING TO OUTBUILDINGS AND RE-ROOFING REUSING EXISTING SLATES INCORPORATING STRIP ROOFLIGHT; REFURBISHMENT OF ORIGINAL WINDOWS AND DOORS TO OUTBUILDINGS INCLUDING REMOVAL OF NON-ORIGINAL ITEMS; INTERNAL ALTERATIONS AND NEW OPENINGS TO WALLS, REMOVAL OF STABLE LOFT FLOOR, NEW BATHROOMS/UTILITY TO GROUND, 1ST AND 2ND FLOOR, NEW INTERNAL STAIRS AND NEW 1500MM HIGH STONE WALL IN GRANARY YARD; REPLACEMENT OF CEMENT RENDER TO HARBOUR HOUSE BY LIME RENDER TO THE REAR ALONG WITH ALL ASSOCIATED SITE WORKS AND SERVICES
The brief summarizes the pattern across all 711 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief