Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 183 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Longford County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Longford County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Longford County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Longford County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To remove the existing front boundary wall servicing an existing dwelling house together with relocating same together with forming a vehicular entrance into the existing dwelling house and all ancillary site works
The proposed construction of an astro turf playing pitch together with perimeter fencing, erection of lighting poles with lighting and all ancillary site works
To install roof mounted 11Kw solar PV panels on the roof of existing Thomas Ashe Hall, with associated ancillary items for the provision of internal battery storage and all ancillary site works
For the erection of adequate lighting to service the existing carpark to the west side of the Thomas Ashe Hall and the astro turf pitch with play area which are situated to the rear of the school. In addition we also seek permission to install solar PV panels on the roof of the existing school with associated ancillary items for the provision of internal battery storage and all ancillary site works
Of domestic garage with basement. In addition to this, full planning permission is being sought for 1), change of use from domestic garage to creche facilities, 2), additional internal driveway that splays off from existing driveway 3), parking facilities to the rear of existing domestic garage 4), signage for proposed Creche facilities which will be located at the existing entrance to the property and at the front elevation of the proposed Creche, and all ancillary site works whereby full planning permission is now also being sought for the revised location & details of the existing site entrance which are now at variance with the approved plans granted under PL18/77 and all ancillary works
To construct a dormer bungalow type dwelling house, detached domestic garage, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works
The brief summarizes the pattern across all 183 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2660155The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief