Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 715 decisions within 5 km, 3 exact-site or onsite candidate records, and 49 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
49 structured nearby appeal records.
49 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development which will consist of: Construction of an Estates warehouse / storage facility 290m² ground floor area with mezzanine floor (72m²) overall floor area of 362m² together with ancillary single storey storage hut 6.4m², and open plan lean to covered area of 22m² together with all new fencing, gates, landscaping and all associated site works
(i) The refurbishment of existing industrial teaching and maintenance facility building (1015 sqm) comprising internal alterations, upgrade of the toilet facilities, with minor alterations to north elevation of the building comprising a new proposed roller shutter door to workshop (ii) Proposed single storey extension to the south east corner of existing building comprising new entrance, reception space, with offices accommodation (275 sqm) (iii) Proposed boiler house extension (50 sqm) to the rear of the existing building (west façade), together with new external signage adjacent the proposed entrance and all associated site works.
Construction of 2no semi-detached dwelling houses as a single block, connection to public services and all associated site works
Construction of a rear extension, conversion of existing carport to a utility, assorted internal reconfigurations, widening of the existing site entrance and carparking to front, and all associated site ancillary works
The development consists of the following: (i) retention of a single storey extension to the east elevation of the existing house; (ii) retention of a single storey extension to the west elevation of the existing house; (iii) retention of the conversion of the garage to living accommodation on the south elevation of the existing dwelling and all ancillary site works.
RETENTION for development consisting of 2 no. below ground firefighting water storage tanks, with a total capacity of 84m3 and associated ancillary works
The brief summarizes the pattern across all 715 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660241The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief