1.Extension to existing dwelling house at ground floor 2. Dormer roof construction and increase in ridge height to accommodate habitual room 3. Amendment to elevations, 4. All associated site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Scrub , Daingean , Co. Offaly
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 78 nearby planning records within 5 km where a location match is available.
- Matched source
- 2660268
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
CONSTRUCTION OF 1 NO. PIG HOUSE TOGETHER WITH ALL ANCILLARY STRUCTURES (TO INCLUDE MEAL STORAGE BIN(S)) AND ASSOCIATED SITE WORKS (TO INCLUDE UPGRADING THE EXISTING ENTRANCE) ARISING FROM THE ABOVE PROPOSED DEVELOPMENT
CONSTRUCTION OF 1 NO. PIG HOUSE TOGETHER WITH ALL ANCILLARY STRUCTURES (TO INCLUDE MEAL STORAGE BIN(S)) AND ASSOCIATED SITE WORKS (TO INCLUDE UPGRADING THE EXISTING ENTRANCE) ARISING FROM THE ABOVE PROPOSED DEVELOPMENT
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE/STORAGE SHED, SEPTIC TANK/ETS PERCOLATION AREA AND ASSOCIATED SITE WORKS
NEW DWELLING HOUSE, DOMESTIC GARAGE, TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
ALTERATIONS TO THE PLANS AND ELEVATIONS OF THE DWELLING HOUSE ASSOCIATED WITH THE PREVIOUSLY APPROVED PLANNING PERMISSION 17-485
The brief summarizes the pattern across all 78 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2660268The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief