Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,575 decisions within 5 km, 3 exact-site or onsite candidate records, and 230 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
230 structured nearby appeal records.
230 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposed development at Clayton Hotel Limerick, Steamboat Quay, Mountkennet, Limerick, V94 H6HN, will consist of the replacement and relocation of the existing high-level illuminated sign on the western elevation of the hotel with a new internally illuminated sign, oriented horizontally at a higher level, and all ancillary site works.
The change of use from restaurant to offices and all ancillary works
1. Subdivision of a singular commercial unit into 2no. commercial units; 2. Alterations to the internal layout; 3. Alterations to the front elevation of the building, including the relocation of the main entrance door and 1no. window; 4. All associated site works
(I) change of use from office to residential on first and second floor levels; (ii) provision of 14 no. studio apartments, with existing access from Dock Road; (iii) extension to existing to floor plate at first and second floor levels(17.2sq m); (iv) extension of existing access deck at second floor (41.7 sq m); (v) upgrade to existing courtyard landscape amenity space; (vi) ancillary site works
Inserting a mezzanine floor level into the ground floor retail unit of previously granted planning permission no. P03/770230, for retail and storage use, with associated changes to the dock road elevation and signage and to carry out all associated site works
1. port enhancement works involving the removal and reorganisation of buildings and features adjacent to the 'Clock Tower' and; 2. the mooring of a floating vessel for the use of commercial data storage; construction of; a new industrial building comprising workshop with ancillary storage and office space; and associated compound comprising associated power generators and infrastructure. The proposed works include: (a) demolition of the existing ESB substation, store building and walled enclosure adjacent to the clock tower; and, (b) provision of; (I) new ESB substation building and perimeter boundary around the generator sets, (ii) associated service and car parking area, (iii) connection to existing port infrastructure and utilities, (iv) cable gantry and access platform between the vessel and the quayside, and (v) all associated site development works. The proposed works are located adjacent to a Protected Structure RPS Ref.: 324 (The Clock Tower) but do not include the Protected Structure within the site or works to the protected structure
The brief summarizes the pattern across all 2,575 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660361The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief