Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 670 decisions within 5 km, 5 exact-site or onsite candidate records, and 59 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
59 structured nearby appeal records.
59 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Change of use from retail showroom to Coffee Shop within curtilage of existing building along with new signage and alterations
Planning permission to retain a pitched roof over a pre-existing flat roof together with changes to the front and rear elevations on a commercial storage building at Barcastle Industrial Estate, Castlebar, County Mayo.
For the change of use of a vacant commercial unit to a medical use comprising of a new medical diagnostics facility with X-Ray, MRI, CT and Ultrasound scanning services and all associated administrative spaces. Associated development works to facilitate this change of use comprise of internal fit out, elevational alterations including modification to existing curtain wall glazing and external wall to relocate the existing entrance door on the east elevation, partial demolition of existing first floor area to accommodate ceiling heights required at ground floor. The proposed development also includes a new electrical substation, new signage, and all associated site development works at Barcastle Retail Park, Castlebar, Co. Mayo, F23 WK40.
The development will consist of the construction of a 2-story commercial building, including a café and retail showrooms at ground floor and offices at upper level. The development will also include car parking facilities, landscaping, signage, the realignment and use of the existing entrance from Lawn Road and all necessary and associated site works and connections to public services.
ERECT A DIGITAL LOCAL COMMUNITY NOTICE BOARD TOGETHER WITH ALL ASSOCIATED SITE WORKS
Retention of self containment unit at 77 McHale Road, Castlebar
The brief summarizes the pattern across all 670 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660376The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief