Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 237 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE DEVELOPMENT CONSISTS OF (1) THE RETENTION OF THE GARAGE AS CONSTRUCTED (106.2M2), (2) REAR HOUSE EXTENSION AT GROUND AND FIRST FLOOR (18.52M2), (3) ALTERATION TO HOUSE RIDGE LINE, ROOF AND WINDOW FENESTRATIONS AS CONSTRUCTED, (4) UPGRADE OF WASTEWATER TREATMENT SYSTEM TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS.
Construct a dwelling house type and septic tank/proprietary effluent treatment system together with all ancillary site works and services
UPGRADE OF THE BALLINDINE WASTEWATER TREATMENT PLANT COMPRISING OF; CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE HOLDING TANK COMPLETE WITH INTERNAL MIXER, ACCESS STAIRS AND PLATFORM, CONSTRUCTION OF NEW SLUDGE FORWARD FEED AND FINAL EFFLUENT WASH WATER PUMPING STATIONS; REPLACEMENT OF THE EXISTING INLET SCREEN WITH A NEW INCLINED INLET SCREEN, WIDENING OF TWO EXISTING BRIDGE CULVERTS ALONG THE SITE ACCESS ROAD, WIDENING OF THE SITE ENTRANCE GATE, INSTALLATION OF A GRP KIOSK TO HOUSE ELECTRICAL CONTROL PANEL AND ALL ANCILLARY SITE WORKS
The development will consist of: The installation of a new wastewater treatment system and 6EH Ecoflow Premier Tech Tertiary filter filter and all site works associated with the development.
ALTERATIONS TO THE EXISTING CLUBHOUSE BUILDING TO ENCLOSE EXTERNAL VERANDA, FLOOD LIGHTING MOUNTED ON NEW LIGHTING COLUMNS TO THE WALKWAY ON THE PITCH PERIMETER AND ALL ANCILLARY SITE WORKS
Construction of a new building within the school grounds to accommodate a classroom and 2 No. special needs rooms, toilet facilities and store with all ancillary works.
The brief summarizes the pattern across all 237 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660400The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief