Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of the construction of a new single-storey family dwelling, detached garage, new wastewater treatment system, connection to existing services, and all associated site works and landscaping
INSTALLATION OF TWO NEW CONTINUOUS SAND FILTERS TO REPLACE THE EXISTING SAND FILTERS, INSTALLATION OF TWO NEW CHEMICAL STORAGE TANKS, CONVERSION OF THE EXISTING SLOW SAND FILTER TO A STORAGE RESERVOIR, THE INSTALLATION OF A NEW KIOSK TO HOUSE CONTROL EQUIPMENT, THE INSTALLATION OF A NEW BOUNDARY FENCE AND ALL ANCILLARY SITE WORKS
CONSTRUCTION OF AN EXTENSION 1928.95SQM TO THE SOUTH WEST OF THE EXISTING LOGISTICS WAREHOUSE PREVIOUSLY GRANTED UNDER P06/1616 ALONG WITH CAR PARKING AND ANY OTHER ANCILLARY SITE WORKS
PROVISION OF 2 NO. GROUND FLOOR FIRE ESCAPE DOORS TO EASTERN ELEVATION, 1 NO. GROUND FLOOR FIRE ESCAPE DOOR TO WESTERN ELEVATION, 1 NO. FIRST FLOOR FIRE ESCAPE DOOR AND ASSOCIATED EXTERNAL STAIRCASE TO WESTERN ELEVATION, AND ASSOCIATED AND ANCILLARY DEVELPMENT WORKS INCLUDING INTERNAL RECONFIGURATION AND PERMISSION FOR RETENTION FOR AS CONSTRUCTED CHANGES TO EAST AND WEST ELEVATIONS OF FRONT EXTENSION PERMITTED UNDER P06/414, CONSTRUCTION OF A SINGLE STOREY (HIGH BAY) EXTENSION TO REAR OF PREMISES, CONSTRUCTION OF SINGLE STOREY EXTERNAL STORES TO EASTERN ELEVATION, PROVISION OF EXTERNAL PLANT/EQUIPMENT, CONSTRUCTION OF INTERNAL MEZZANINE AREA AND ALL ASSOCIATED AND ANCILLARY DEVELPMENT WORKS
Amend granted permission ref. P20/1034 for development consisting of changes to the planning approved building footprint, elevation and floor area and to the approved car parking layout
CONSTRUCT A GYM/BOXING CLUB FACILITY WITH OFFICE, CHANGING ROOMS, SHOWERS, KITCHEN, TREATMENT ROOM AND AN ADJOINING MEN'S SHED FACILITY TO INCLUDE A WORKSHOP, STORAGE, KITCHEN, TOILETS WITH ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660401The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief