Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 269 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A domestic detached garage with car-port as constructed and a rear sunroom to the existing dwelling house as-constructed
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works
Construction of a dwelling, garage, effluent treatment system, entrance and all associated site works
The construction of a dwelling house (part single storey and part two storey) including provision of a waste water treatment system and percolation area, new front boundary wall, site entrance, bored well, garage, hard and soft landscaping and all ancillary site works
The construction of a dwelling house, domestic garage, entrance, proprietary treatment system and polishing filter, bored well and all associated site works
The renovation and extension of existing dwelling house to include new windows and roof to existing dwelling house, decommissioning of existing septic tank system and the installation of a new replacement packaged wastewater unit with percolation area and all associated site works. Retention Permission for existing mobile home for use during construction period
The brief summarizes the pattern across all 269 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660517The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief