Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 111 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new dwelling house, domestic detached garage, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site works
Construction of a new dwellinghouse and detached domestic garage with associated wastewater treatment system, percolation area, sharing parents existing site entrance and related site works
The construction of a development consisting of 10 No. Single storey housing units laid out in 2 Blocks of 5 Units, access road, car parking, hard and soft landscaping, retaining walls, bin storage with connection to public sewers, all public utility services along with all associated site works
A 10 year permission for (1) the construction of a wastewater treatment plant at Caheragh, Glin, including rising mains discharge chamber, inlet works with screen, flow distribution chamber with flow monitoring, 2 no. primary settlement tanks with splitter chamber, sludge pumping station and sludge holding tank, storm storage tank, tidal tank, control building, surface water drainage network including swale linking to existing drains, site lighting (both task lighting and road lighting), boundary fencing, landscaping and biodiversity enhancements, solar panels on block mounted frames, and entrance scheme signage. Access to the wastewater treatment plant to be provided via a proposed new entrance onto the public road network to the south (L-6106), below ground interconnecting pipework; (2) the construction of a wastewater terminal pumping station (TPS) including: underground storm storage tank, pump sump chamber, flow meter chamber, overflow chamber with screen, 2 no. valve chambers, bauer connection chamber, wet and control kiosks, vent stack, landscaping to include redesign of Town Park public amenity area, removable bollards, the temporary removal and re-instatement of a portion of the wall, and all ancillary site development works at Ballygiltenan North, Glin; (3) Foul water rising main between the wastewater treatment plant site and terminal pumping station comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (4) Gravity storm overflow pipeline from terminal pump station to a new outfall in the maritime area comprising the laying of pipework within the town park and Coast Road (N69) including a rodding and scour chamber;(5) the construction of a new effluent outfall gravity pipeline from wastewater treatment plant site to a new outfall in the maritime area comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (6) partial demolition/decommissioning of the existing tidal tanks and decommissioning of the existing outfall pipeline assets landwards of the High Water Mark (HWM) within the Town Park public amenity area; (7) Proposed upgrades to underground foul sewer network at the junction of Mary Street and Coast Road (N69) comprising the laying of new sewer pipework to the terminal pumping station and; (8) all associated site development and site excavation works above and below groun
(a) the construction of a single storey extension to rear, (b) adding doors to existing window ope to side(south-east) elevation and (c) all ancillary site works
1) removal of existing single-storey metal storage shed from site; 2) removal of existing manual car washing facilities from site; 3) removal of solid fuel storage area; 4) relocation on site of existing bin storage area and of 1 no. diesel dispenser; 4) construction of new proposed single-storey extension to side of existing amenity building to accommodate back-of-house areas; 5) internal alterations to the existing amenity building to include planning permission for change of use of part of existing ground floor shop from retail use to new off-licence use (sale of alcohol for consumption off the premises to be ancillary to the existing primary retail use and located in within the convenience shop floor area); 6) minor elevational changes to the exiting elevations of amenity building; 7) all associated site development works
The brief summarizes the pattern across all 111 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660518The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief