Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,012 decisions within 5 km, 1 exact-site or onsite candidate record, and 180 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
180 structured nearby appeal records.
180 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a two storey extension to side of existing dwelling, a pitched roof over main entrance to the front of existing dwelling to form an open porch and associated site works
Demolition of existing single storey extension to rear of house. Construction of a new single storey extension to rear of house. Removal of existing flat roof to side and replace with a pitched roof with minor elevation changes, extension of front hall in line with existing front step to increase depth of internal entrance hall and construction of a single storey shed to rear garden with all ancillary site works
Construction of an extension to the rear of the two storey dwelling house & all ancillary site works
The construction of a two storey extension to the rear of the existing dwelling house and all associated site and ancillary works
Raising the end gable wall and the hip roof to facilitate an attic conversion and all ancillary site works
The construction of a single storey extension to the rear of the existing dwelling, conversion of attic space to habitable accommodation and the provision of rooflights to the front and rear elevations together with all associated incidental and site works
The brief summarizes the pattern across all 2,012 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660531The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief