RETENTION OF ALTERATIONS TO EXISTING SERVICE STATION TO INCLUDE NEW DRIVE THRU ELEMENT, INCORPORATING ALL ASSOCIATED SITE AND ANCILLARY WORKS TO BE RETAINED AS CONSTRUCTED, WITH ALL ASSOCIATED ANCILLARY SITE WORKS
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
LAVEYBEG , CHARLESTOWN
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 161 nearby planning records within 5 km where a location match is available.
- Matched source
- 2164
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
INSTALLATION OF A MODULAR SUBSTATION AND ANCILLARY SITE DEVELOPMENT WORKS TO FACILITATE 2 NO. SHARED ELECTRIC VEHICLE FAST-CHARGING UNITS AND 4 NO. CHARGING BAYS WITHIN A PARTIALLY RECONFIGURED PARKING AREA
(A) RETAIN EXISTING DOMESTIC GARAGE AND (B) EXTEND AND CARRY OUT ALTERATIONS TO GARAGE INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES
32 NO. (300w) MONO CRYSTALLINE PHOTOVOLTAIC SOLAR PANELS ON THE SOUTHWEST ROOF SURFACE OF THE EXISTING DRESSING/CHANGING AND STAFF ROOM BUILDING IN THE INTERESTS OF ENERGY CONSERVATIONS
CONSTRUCTION OF 6 NO. 2 BED SEMI-DETACHED BUNGALOWS WITH CONNECTION TO PUBLIC SERVICES WITH ALL ANCILLARY SITE WORKS
The development will consist of the construction of 20 no. dwelling houses (18 semi-detached & 2 detached), effluent pumping station, connection to existing utilities together with ancillary site development works.
The brief summarizes the pattern across all 161 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2164The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief