Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 349 decisions within 5 km, 5 exact-site or onsite candidate records, and 86 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
86 structured nearby appeal records.
86 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For and existing development. The development consists of an existing 25 metre high telecommunications support structure (total height including antennas 26.4 metres) carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference 13/30. The development will continue to form part of Meteor Mobile Communications Ltd. existing and future telecommunications and broadband network
For the construction of dwelling house, domestic garage, site entrance and all associated site works
For construction of a new extension to the front, rear and side of existing dwelling along with elevational modifications, ((b) Retention Permission of elevational modifications to previously granted side extension (Planning Ref 98854) and all site and ancillary works at
For the construction of a single-storey dwelling house, on site treatment-system, New vehicular access and all site and ancillary works
To retain indefinitely the field stone roadside boundary fence and the matching accompanying field stone entrance to the property from the adjoining public road (R671) and also the retention indefinitely of the forecourt, driveway, apron and garden. All on their single storey, detached residential property site
For a development consisting of the demolition of a prefabricated building and for the construction of a single storey extension and associated works
The brief summarizes the pattern across all 349 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2288The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief