Relocation of existing farm house entrance to new position and for the closing up of existing farm house entrance and all ancillary works on existing site
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Rathnamuddagh , Dysart , Co.Westmeath
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 134 nearby planning records within 5 km where a location match is available.
- Matched source
- 23112
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Retention of existing entrance driveway from public road L1235 No. to house, and permission to erect new entrance gate and piers on this driveway at site entrance.
Construction of a flat roof extension to the side and rear of our existing dwelling to include two bedrooms, one with en-suite & wardrobe, bathroom, kitchen, dining and utility and to demolish existing porch at the side and remove pitch roof at the rear and replace with a flat roof with all ancillary site works
To construct 01 No. Dwelling, Garage, Septic Tank and percolation area and all associated Site Works
The construction of a new two storey dwelling with separate garage and fuel store and waste water treatment system and percolation area, site entrance and boundary treatments and all associated site works
Construction of a new agricultural entrance with all ancillary site works
The brief summarizes the pattern across all 134 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 23112The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief