Development which will consist of an extension of the internal road network from the existing 1-arm roundabout located to the West of the site. The development will include a road extension (approximately 75m long), associated footpaths, public lighting and all associated services and site works to facilitate the development
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
IDA Ardmore Business & Technology Park , Marlinstown Ardmore , Mullingar Co. Westmeath
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 684 nearby planning records within 5 km where a location match is available.
- Matched source
- 2360224
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Consisting of an extended hardstanding area(50m x 37m) for improved circulation, facilitating current operations, and a complementary enhanced landscaping amenity area adjacent to the existing premises and all associated ancillary works.
Development consisting of the installation of a roof mounted solar photovoltaic panels to include all ancillary works and services
Development which will consist of the following works: 1. Full Permission is sought for the construction of a new shipping area and tank storage extension building to the rear of the existing building. 2. Retention Permission is also sought for the as constructed engine storage facility building to the rear of the existing building together with the security fencing erected along the northeastern boundary all as shown on the submitted drawings with all ancillary site works and services
Development which will consist of the replacement of a permitted single storey terminal electrical station and separate permitted switchgear enclosure (both previously permitted as part of a solar farm permission by An Bord Pleanála Reference ABP-300135-17 (Westmeath County Council Planning Ref. 16/6264) with 1 no. proposed single storey 20kV substation building on the site of the previously permitted terminal station. The development also incorporates proposed track revisions adjacent to the substation to accommodate an emergency fire tender turning area
Upgrade works to the existing entrance with the installation of a new security gate and fencing, installation of security cameras including cabinets and installation of a new rigid wire mesh boundary fence around the entire site (approx. 2.4km)
The brief summarizes the pattern across all 684 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2360224The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief