The proposed construction of a machinery storage shed and all ancillary site works whereby planning permission for the proposed machinery storage shed is now being sought for use as commerical storage which will be used in conjunction with the applicants business
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Ballynacross , Granard , Co. Longford
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 184 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460110
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Extension to existing domestic garage at my residence
The material change of use of an existing barn to a one bedroom granny annex to including internal and external alterations to the existing barn, connection to existing on site septic tank and other services and all ancillary site works
Demolition of existing derelict dwelling house and outhouses and construction of a walled silage pit along with all ancillary siteworks
Construct a 4-bay loose cattle shed and all ancillary site works
For the proposed demolition of existing Partially Constructed Dwelling House together with the proposed construction of a Two Storey Type Dwelling House with Detached Garage, Entrance, Boundary Wall/Fence, Septic Tank with Percolation Area and all ancillary site works
The brief summarizes the pattern across all 184 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2460110The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief