A) demolition of all existing buildings boundary walls and access b) proposed construction of 24 No. dwellings consisting of 10 No. 3 Bed Semi-detached Two Storey, 11 No. 3 Bed Terrace Two Storey (in 3 Blocks), 2 No. 2 Bed Semi-detached single storey and 1 No. 2 Bed detached single storey Dwellings b) provision of new entrance, parking and internal access road c) new green open space, boundary fences /walls, pedestrian path and bicycle parking e) Connection to Public Services including mains sewerage, water supply and all associated ancillary site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Water Street & College Heights , Townparks Castlepollard , Co.Westmeath
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 157 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460240
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Development which consists of the retention of a rear two storey extension to an existing dwelling as follows. Bedroom, En-Suite, Kitchen Dining Area at Ground Floor Level (41.3 sq.m.), Bedroom and En-Suite at First Floor Dormer Level with loft access and stairs in existing dwelling (35.9 sq.m)
Development which will consist of an extension to the existing school as follows: (1) Construction of a single storey extension to the North of the existing school consisting of a 2-classroom SEN base, associated toilets, Central Activities Area and ancillary spaces. A further single storey extension at the West of the existing school consists of 2 SET Rooms and Assisted Changing Room. The works include the installation of roof mounted PV Panels. (2) Alterations within the existing school to form an internal link to the proposed SEN extension and connection to the GP Hall. (3) Provision of parking spaces and set-down within the school site, with the construction of new one-way traffic system with access and exit points for vehicles onto Water Street. (4) The provision of an EV (Electric Vehicle) charging point. (5) The removal of a play shelter and a storage container from the site. (6) All siteworks associated with the above
Construct 5 no. townhouse type dwellings (comprising of 1 no. block of 3 no. 3 bedroom dwellings with converted attics & 1 no. Block of 2 no. 3 bedroom dwelling Semi Detached dwellings with converted attics), form new entrance onto existing laneway, parking area, connect to public sewerage system and all ancillary site development works
Extension of Duration to demolition as necessary, the existing buildings on site, construction of 1 No. 2 bed terrace dwelling, 2 No. 2 bed apartments, 2 No. commercial units, all fronting onto The Square, construction of 4 No. 2 bed 2 storey semi-detached dwellings to the rear of the site, all associated car parking, access onto public road, connections to the existing public drainage infrastructure, all private and public open spaces and all ancillary site services
Demolitions as necessary of the existing buildings on site, construction of 1 No. 2 bed terrace dwelling, 2 No. 2 bed apartments, 2 No. commercial units, all fronting onto The Square, construction of 4 No. 2 bed 2 storey semi-detached dwellings to the rear of the site, all associated car parking, access onto public road, connections to the existing public drainage infrastructure, all private and public open spaces and all ancillary site services
The brief summarizes the pattern across all 157 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2460240The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief