Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 49 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a single storey type domestic extension to the existing domestic dwelling, upgrade the existing waste water treatment system to the current EPA code of practice and all ancillary works
Construct an agricultural lane and all ancillary works.
Demolish existing derelict dwelling and construct new dwelling with new sewage treatment system and all associated site development works
(a) retain the existing single storey domestic dwelling, (b) upgrade the existing waste water treatment system to current EPA code of practice and all ancillary works
Development consisting of the installation of battery arrays, located within container units (16 number units, each 30 m2 by c. 2.6m tall), a control building (c.160.5m2 by c. 6.4m tall), transformer (c.5m tall) and a new site entrance. the development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. the overall development site is c. 0.44Ha. The application includes a Natura Impact Statement (NIS)
The construction of a new forestry access entrance to an existing mature forestry and all ancillary works
The brief summarizes the pattern across all 49 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18166The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief