Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 329 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a Storage Facility, for prefabricated modular buildings, a new road entrance and a perimeter fence
For the construction of an industrial type building for the secure storage of prefabricated modular building components and all associated site works at the existing storage facility granted permission under file ref number 21/1544
For a fully self-sufficient mobile community coffee service, with its own water supply and electric power supply. The service will be provided from a mobile covered horsebox by Allenwood Community Development Association CLG (ACDAL)
A private on-site package wastewater treatment system on the Allenwood Community Development Association CLG (ACDAL) site. The work includes the construction of a new wastewater treatment plant with primary and secondary treatment discharging to wetland ponds for tertiary treatment with passive discharge of the treated effluent through peat to ground. A new below ground foul pipe network and pumping station are also included.
Sought for a reduction in the number of car parking spaces required under planning application Ref. 07/2407 from 144 to 33 at the premises
For the construction of a detached two storey house with single storey element, secondary effluent treatment system, utilisation of existing shared family entrance and all associated site works
The brief summarizes the pattern across all 329 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211544The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief