Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 152 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) retain extensions to the rear and side elevations of existing two storey dwelling house (b) to retain existing single storey private workshop including toilet and domestic storage area (c) retain alterations to rear and side elevations of existing dwelling and (d) to retain existing stable in lieu of Retention to (a) retain single storey extension to the rear and side elevations of existing two storey dwelling house(b) to retain existing single storey private workshop including toilet and domestic storage area (c) retain alterations to rear and side elevations of existing dwelling
(a) erect type dwelling house with accommodation at attic level, domestic garage, mechanical effluent treatment unit and percolation area; (b) To utilise and upgrade existing forestry entrance previously granted under planning permission Ref: P.15/155 to provide entrance and access road to proposed development including all ancillary site works necessary to complete the development.
1. erect dormer type dwelling house with accommodation at attic level, domestic garage, mechanical effluent treatment unit and percolation area. 2. To utilise and upgrade existing forestry entrance previously granted under planning permission Ref: P15/155 to provide entrance and access road to the proposed development including all ancillary site works necessary to complete the development
Demolish existing habitable dwelling house and decommission existing septic tank and percolation area. 2. To construct a replacement storey and half bungalow type dwelling house on same footprint as the existing dwelling house. Provide mechanical effluent treatment unit percolation area, including all ancillary works necessary to complete the development
(1) retention of single storey rear extension to the South of the dwelling (2) retention of attic conversion & associated roof lights (3) retention of detached shed (4) permission for the construction of a new single storey extension to the South West of the existing dwelling comprising of Accessible Bedroom & Bathroom and (5) associated site works & services
1) retention of existing rear garage; 2) retention of revised site boundaries; 3) permission for demolition of exiting (North) porch and replacement with new; 4) permission for the construction of a new single storey extension to the rear (south) of existing detached dwelling house complete with associated internal reconfigurations and associated site works & services.
The brief summarizes the pattern across all 152 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17174The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief