Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 859 decisions within 5 km, 1 exact-site or onsite candidate record, and 77 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
77 structured nearby appeal records.
77 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To extend and convert existing building into a creative retreat centre and art psychotherapy clinic which consists of, in the existing building, a kiln ceramic room, w.c., lobby and wash area and on the ground floor in the extension a hall, store, individual room, kitchen and group room and on the first floor in the extension an office with five Velux windows and to decommission existing septic tank and percolation area and to construct a new treatment system and percolation area with all ancillary site works
Existing buildings to include truck repair/maintenance, repair maintenance area, offices, storage buildings and fuel storage tank and all associated site works
The renovation, alterations and refurbishment of existing single storey dwelling, new single storey link extension and new two storey extension to rear of existing dwelling, connection to existing services, relocation of existing entrance, construction of domestic garage to rear of dwelling and all ancillary works
For the construction of extensions to the front and sides of the existing building and all associated site development works. Revised by Significant Further Information which consists of: Additional existing temporary structures have been included on the revised Site Layout Plan
Development at the subject site of 0.346 hectare at Hartwell Upper, Kill, Co. Kildare. The development will consist of planning permission for a concrete recovery operation for the acceptance and processing for re-use, and temporary storage prior to transporting off-site of concrete material at Hartwell Upper, Kill, Co. Kildare. It is proposed to accept up to 17,000 tonnes per annum of material. The application relates to an activity requiring a Waste Facility Permit from Kildare County Council.
For the importation of clean topsoil and subsoil in the subject site of 7.2 hectares in order that the site can be rendered suitable for planting native broadleaf forestry
The brief summarizes the pattern across all 859 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17788The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief