Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 328 decisions within 5 km, 11 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) planning permission for new entrance and driveway and to close up existing entrance and driveway (b) retention of dormer type bungalow and associated site works
(A) a single storey extension to the rear (north west elevation) of an existing dormer bungalow previously granted under file 07/1681. (B) alterations to existing side (south west elevation) consisting of replacing the existing double doors with a window and minor internal alterations within the existing house and all associated site works,
The development of (A) the erection of a storey and a half type house (B) garage/store for domestic use (C) connection to existing public foul sewer and mains water and all associated site works
For a temporary on site wastewater treatment system with discharge to main sewer serving 10 no. dwellings previously granted planning permission under reference 19-493. The proposed development works consist of A) On site PTA Solido Smart XL modular SBR wastewater treatment system with gravity sewer connection to existing main sewer, B) Foul sewer pump station with rising main to the proposed on site wastewater treatment system, C) provision of future on site treatment system bypass sewer route with direct connection to the main sewer. D) site infrastructure works including all associated site development, landscaping, boundary treatments and facilitating works
For 10 no. dwellings consisting of A) eight number three bedroom semi-detached dwellings, B) one number three bedroom detached dwelling, C) one number four bedroom detached dwelling with domestic garage, D) site infrastructure works including access road with associated footpaths, storm water collection drains and onsite attenuation and soakway areas, foul sewer connection to existing public main and watermain infrastructure, E) New site entrance along with all associated site development, landscaping, boundary treatments and facilitating works.
For 10 no dwelling consisting of A) eight number three bedroom semi-detached dwellings, B) one number three bedroom detached dwelling, C) on e number four bedroom detached dwelling with domestic garage, D) site infrastructure works including access road with associated footpaths, storm water collection drains and onsite attenuation and soakway areas foul sewer connection to existing public main and watermain infrastructure, E) New site entrance along with all associated site development, landscaping, boundary treatments and facilitating works.
The brief summarizes the pattern across all 328 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17985The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief