Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 843 decisions within 5 km, 2 exact-site or onsite candidate records, and 45 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
45 structured nearby appeal records.
45 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a new 60 bed nursing home facility with access via the existing service road off the Killeshin Road and all ancillary site works
A new business park namely West Link Business Park comprising of 14 new buildings & 1 ex. building. Development will be accessed via the existing service road to the filling station off the Killeshin road and a new internal road network provided. new development will be used to provide facilities for light industry manufacturing, light engineering, bulky retail, storage & office facilities. it is proposed to connect to existing services on site & provide all ancillary site services
Retain the change of use of a Games room / Playroom granted under Planning Ref 99464 to a self-contained family living accommodation unit. Full planning permission to construct an extension to the side and rear of same building and all associated site works. This existing building together with the proposed extension is to be used in conjunction with, and for the enjoyment of the existing dwelling.
Retain an existing detached domestic shed and associated site works
Retain extension to the rear of existing dwelling as constructed. Full planning permission to construct a new extension to the rear of same dwelling, demolition of existing domestic shed to facilitate the proposed extension and all associated site works
Retain solid fuel yard area with 1no. Container for storage and 1no.Porto cabin type Container for Office use to include external storage and concrete yard with Pallisade fencing and Pallisade gate at Leinster Co Op Marts, Ballykillen, Killeshin Road, Carlow, County Laois. Permission sought for 2no. roadside advertisement signs 1.2m x 1..2 m.sq at the entrance of the above address. The Retention planning permission and the Permission is sought for a temporary period of 5 years
The brief summarizes the pattern across all 843 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1811The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief