Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 305 decisions within 5 km, 1 exact-site or onsite candidate record, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For (i) 1,860 sqm extension to the existing on-site car park (ii) installation of associated storm water drainage and connection to existing system on site and all other associated site development and ancillary works to serve the development
(i) Construction of a new steel portal framed building comprising 1,547sqm of warehouse space and ancillary office space with a building height of 8.5m., (ii)Connection to existing on-site services and all associated site works.
Construct an advanced technology building as follows: industrial unit 1,512sqm with 4 no loading bays to rear, 512sqm 2-storey office and reception area to front comprising 269.5sqm at ground level and 242.5 sqm at first floor level (overall floor area 2,027sqm); 56 no. parking spaces and 5 no disabled parking spaces, entrance from existing access point to access road (constructed under previously approved reg ref: 15/110), bicycle stand and electric vehicle charging station, solar panels to roof, provision of grey water system and associated underground water storage tanks, connection of all site services and all ancillary works
Construct Advanced Technology Building as follows: industrial unit 1,512sqm with 4 no. loading bays to rear, 512 sqm 2-storey office and reception area to front comprising 269.5sqm at ground level and 242.5 sqm at first floor level ( overall floor area 2,027 sqm); 56 no. parking spaces and 5 no. disabled parking spaces, entrance from existing access point to access road ( constructed under previously approved reg ref: 15/110), bicycle stand and electric vehicle charging station, solar panels to roof, provision of grey water system and associated underground water storage tanks, connection of all site services and all ancillary works
(a) Retention of Extension to the Rear of the Existing Workshop, (b) Retention of Portacabin, (c) Retention of Detached Storage Shed, (d) Retention of Waste Products Storage Area and (e) Full Planning Permission to Construct Extension to the Front building with associated Elevational Changes and all associated site works
Construction of a new car park containing 181 car parking spaces together with installation of associated surface water drainage system and connection to existing system on site together with all associated site works
The brief summarizes the pattern across all 305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18265The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief