Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 845 decisions within 5 km, 2 exact-site or onsite candidate records, and 51 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
51 structured nearby appeal records.
51 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a single storey industrial unit with offices and workshop (on previously granted fully serviced site, planning ref 04/467), associated parking and hardstand area, front and rear entrance, perimeter fencing and wall, connection to all existing services onsite and associated site works
The construction of extension to the existing industrial unit and all ancillary site development works
The construction of a commercial/light industrial portal frame structure with ancillary office accommodation, replacement of existing site entrance, new entrances and perimeter boundary treatments including new subdivision boundary, additional parking facilities, and associated services and site works
The construction of a commercial/light industrial portal frame structure with ancillary office accommodation, replacement of existing site entrance, new entrances and perimeter boundary treatments including new subdivision boundary, additional parking facilities, and associated services and site works
Retention planning permission is sought to retain timber chalet style after school room as constructed to the rear of existing créche facility, all ancillary site works and services
Alterations to existing light industrial and associated office space unit as granted under Pl Ref. 04/897, to carry out internal changes comprising of a first floor area and full planning permission to carry out elevation alterations to accommodate same
The brief summarizes the pattern across all 845 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18480The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief