Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,348 decisions within 5 km, 11 exact-site or onsite candidate records, and 121 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
121 structured nearby appeal records.
121 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of two number two storey two bedroom dwellinghouses and associated site develoment works.
Permission for the following: 1. Construction of 3no. 3-storey townhouses along with car parking provisions, boundary treatments, hard & soft landscaping 2. All associated site development and infrastructure works. *Significant Further Information received on 04/12/2024*
Permission for the development of electrical charging infrastructure for its Battery Electrical Multiple Units (BEMU) fleet at Drogheda MacBride Railway Station. Comprising of the construction of a modular 10kv ESB/traction substation in the lower car park of the railway station, overhead line charging facilities at 2 no. platforms and 1 no. depot track and electrical cables in ducts form the substation to the charging facilities, together with all necessary ancillary works. The proposed works include: - ESB/Traction substation, comprising two separate adjacent compounds (one for ESB and one for Iarnród Éireann) with - ESB compound comprisin ga building c.4.4m x 4.9m x 2.95m high, dedicated pedestrian and vehicular access, 2 no. dedicated car parking spaces and security fencing; - A number of car parking spaces within the lower car park will be removed to accommodate the proposed substation, reducing the available car parking spaces from 98 to 44 spaces; - Iarnród Éireann compound comprising up to 5 no. modular containerised units, c. 2.6m x 8.0m x 3.5m high, pedestrian access and security fencing; - Ancillary works including landscaping, drainage and utilities; - Electrical cabling works, underground and partially buried in cable troughs between the ESB/Traction substation and overhead line charging infrastructure; - Overhead Line Charging Infrastructure; - Provision of overhead line charging infrastructure at 2 no. platforms and 1 no. depot track; - These structures will be galvanised metal structures from 12 masts and will comprise 2 portal frames, 4 double cantilever and 4 single cantilevers; - Ancillary works, including minor relocation of services, drainage and replacement of steel wire mesh protection on the private access staff pedestrian overbridge. The proposed development is within the curtilage of protected structures, The Drogheda MacBride Station, the associated station complex as well as the Boyne Viaduct: Station buildings include shed, turntable RPS - DB-055; Boyne Viaduct RPS - DB-176. A Natura Impact Statement accompanies this application **Significant further information received on 13.12.22**
Permission for proposed first floor extension to the front/side of the existing dwelling house, demolition of existing outbuilding shed, in addition planning permission also sought for one number dwelling house to the rear and side of No. 14 Carmelite Cottages. The new dwelling will be detached from the existing dwelling house, connection into existing sewer network and all associated site development works at Carmelite Cottages, Drogheda, County Louth. *Significant Further Information Received on 30/01/2026 - Change in design of the proposed, the revision proposes 3 new houses, instead of one single new house, revised site plan, engineering details and other associated items.*
Retention permission of the removal of chimney and planning permission of 11.m2 extension on the first floor to the rear, internal alterations and all associated site development works
Retention and Permission Application consisting of Retention Permission for an existing domestic garage on a parcel of land located 20 metres to the north-west of 7 Weir Hope and Permission for 2 no. rear roof windows to include all associated alterations to the roof
The brief summarizes the pattern across all 1,348 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18702The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief