Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 31 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT DWELLING HOUSE AND EFFLUENT TREATMENT SYSTEM ALONG WITH ALL ANCILLARY SITE WORKS
The development shall consist of planning permission for the demolition of an existing shed, planning permission for alterations and modifications to an existing dwelling house, planning permission also to extend the existing dwelling house and to include all other ancillary site services and development works associated with this permission as per the application documentation.
FIVE YEAR PERMISSION FOR DEVELOPMENT OF A TEMPORARY TURNING HEAD AT THE R312 AND R317 JUNCTION, REQUIRED TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE CONSENTED SHESKIN WIND FARM (P19/457). LOCALLY SOURCED GRAVEL WILL BE USED TO WIDEN THE JUNCTION SO DELIVERY VEHICLES CAN PERFORM A TURNING MANOEUVRE. THE LAND REQUIRED FOR THE TURNING HEAD WILL BE REINSTATED SHORTLY AFTER THE TURBINE COMPONENTS HAVE BEEN DELIVERED
Planning Permission to construct a private dwelling house, domestic garage, proprietary effluent treatment system, and ancillary site development works
An extension to the existing dwelling, installation of a new sewage treatment system, a new entrance, and all associated site development works.
COMPLIANCE WITH CONDITION 16 OF P00/1507 "THE COLUMN DESIGN TO THE FRONT PORCH SHALL BE REMOVED FROM THE OVERALL DESIGN OF THE HOUSE AND REPLACED IF REQUIRED BY A SOLID PORCH. A REVISED FRONT ELELVATION SHALL BE SUBMITTED TO AND AGREED IN WRITING WITH MAYO CO CO PRIOR TO COMMENCEMENT" RETAIN AMENDMENT TO FRONT BAY WINDOW TO INCORPORATE HIPPED ROOF DESIGN AS OPPOSED TO A FLAT ROOF PROPOSAL GRANTED UNDER P00/1507. RETENTION OF SHED TO THE REAR OF THE PROPERTY ALTHOUGH THE DESCRIPTION OF P00/1507 REFRES TO A DOMESTIC SHED THERE IS NO RECORD OF SAME ON FILE AND IT IS PROBABLE THAT THE SHED CONSTRUCTED ON SITE IS LARGER THAN ORIGINALLY GRANTED. REVISED BOUNDARY OF DEVLEOPMENT SITE TO COMPLY WITH THE BOUNDARY AS REGISTERED WITH THE LAND REGISTRY.
The brief summarizes the pattern across all 31 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18745The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief